Section / Beta Madhya Pradesh Flood Inundation Forecast System

Beta flood inundation forecasting with public rollout readiness and CaMa-Flood pathway

A beta publication-ready flood inundation forecast system combining MP gauge intelligence, inundation history, GRRR discharge context, and a CaMa-Flood v4.30 output publication pathway.

Active Module

Beta Madhya Pradesh Flood Inundation Forecast System

Flood Intelligence

Open domain overview
Recommended Algorithms
HAND and DEM-derived flood susceptibility Sentinel-1 SAR threshold/change detection CaMa-Flood v4.30 output viewer pathway Google Flood Hub and historical inundation context 25-year and 100-year return-period scenario layers
Data APIs & Inputs
FABDEM/Copernicus DEM Sentinel-1/2 Google Flood Hub CaMa-Flood outputs CWC/gauge observations
Related Modules
Loading Madhya Pradesh flood dashboard...
Basin Statusn/a
Max Water Leveln/a
Peak Dischargen/a
Gauge Countn/a
Inundation Occurrencen/a
Severe Sitesn/a
Highest Riskn/a
Public Rollout Model

Beta Madhya Pradesh Flood Inundation Forecast System Readiness

Loading publication readiness and user rollout model...

Pre-release

Checking rollout stages...

Please wait while the dashboard loads readiness status.

CaMa-Flood Inundation Publication Path

CaMa-Flood output readiness will appear after the dashboard loads.

Public Use Note

This dashboard is loading its public-use limitation note.

Stage 3 | CaMa-Flood v4.30

CaMa-Flood Inundation Output Viewer

Loading CaMa-Flood scenario catalog...

Scenario Metadata

Status
Waiting for scenario selection.

Hydrograph

Stage 3 publication checklist

  1. Run CaMa-Flood v4.30 outside the website for the selected MP basin/domain.
  2. Export depth as flood_depth_cog.tif, extent as flood_extent.geojson, and hydrograph as hydrograph.csv.
  3. Create metadata.json and place all files under outputs/cama_flood/scenarios/<scenario_id>.
Stage 2 Scheduled Mode

Operational CaMa-Flood Output Ingestion

Checking scheduled output readiness...

Scheduler Readiness
Status
Waiting for scheduler status.
Expected Output Files
  • metadata.json
  • flood_depth_cog.tif
  • flood_extent.geojson
  • hydrograph.csv
Scheduler command Loading scheduler command...
NormalRoutine
Above NormalWatch
SevereWarning
ExtremeAlert
Gauge River District Water Level Discharge Status Warning / Danger Occurrence
Loading forecast data...

CWC Gauge Observations

Checking CWC dashboard reachability...

Water level, discharge, warning level, danger level, and operational flood categories.

Inundation History

Water occurrence around gauge corridors for 1999-2020.

Used for historic inundation exposure and map marker intensity.

GRRR Discharge Series

Global river discharge estimates represented as station-aligned line charts.

Used for long-range discharge context from 1980-2023 and reforecast-style dashboard ranges.